Company/Division name | US Wind |
Type of work | Manufacturing |
Reshoring category: | Reshoring |
Total number of jobs (added or to be added): | 500 |
Year reshoring announced: | 2021 |
Domestically, the work will be done: | In-house |
City reshored to: | Baltimore |
State(s) reshored to: | MD |
If relevant, work nearshored to: | - |
Industry(ies): | Fabricated Metal Products, Primary Metal Products (not including Foundries and Castings) |
Product(s) reshored | wind turbine anchors |
What non-domestic negative factors made offshoring less attractive? | Supply chain interruption risk/Natural disaster risk/Political instability |
What domestic positive factors made reshoring more attractive? | Skilled workforce availability/training |