Company/Division name | Polar Semiconductor |
Type of work | Manufacturing |
Reshoring category: | Reshoring |
Year reshoring announced: | 2025 |
Domestically, the work will be done: | In-house |
City reshored to: | Bloomington |
State(s) reshored to: | MN |
If relevant, work nearshored to: | - |
Industry(ies): | Computer & Electronic Products |
Product(s) reshored | High-Voltage Power BCD Semiconductor Wafer |
What non-domestic negative factors made offshoring less attractive? | Supply chain interruption |
What domestic positive factors made reshoring more attractive? | Geopolitical Risk |