A Reshoring Initiative Case Study:

Prevented large consumer project from going overseas

OEM:

  • Company: jr. infinity
  • Location: Albert Lea,
  • Satisfaction with the results: High

Product:

  • carbonated beverage dispenser

Before

Country from which reshored: China
Factors which made offshoring less attractive: Delivery, Quality, Rework, Warranty, Intellectual Property, Emergency Air Freight

After

Number of employee jobs reshored to make this product: 12
Reshored work is in-house.
Domestic factors which made the domestic alternative more attractive: Redesign of the part

Additional Background

Relevant Industry: Miscellaneous
Year Reshored: 2012
Total cost of ownership analysis was used in the reshoring decision.